RED delivers commercial fit-outs and manufactured furniture through a structured, process that integrates site surveys,
technical design, manufacturing and installation into a single programme.
Begin your office fit-out process with a clear understanding of the steps your project moves through, what happens at each stage, and when decisions are required.
All stages reflect our integrated model: one schedule covering surveys, manufacturing, fit-out and installation.
We review the brief, confirm scope and complete a measured site survey. Access routes, services, constraints and live-site conditions are mapped early so design and manufacturing can proceed without rework.
Timeframe
Quotation timelines and survey dates are agreed with you.
Deliverables
Site notes, measured survey data, constraint and feasibility reports.
Client approval needed
Confirmation of scope and any known access or operational constraints.
Integration Point
Survey data is used directly in technical drawings and manufacturing packs.
We prepare space plans, elevations and specifications. Materials, finishes, and furniture requirements are agreed. Technical details are made buildable, with tolerances and installation access planned in.
Timeframe
The design development phase is scheduled with you, based on the scope and complexity of your project.
Deliverables
Space plans and elevations, furniture specifications, material and finish selections.
Client approval needed
Approval of drawings and specifications.
Integration Point
Approved documents move straight into production planning and lead-time confirmation.
A detailed quotation is issued with clear inclusions and exclusions. Manufacturing lead times and installation sequencing are confirmed and combined into one programme. RAMS and access dates are scheduled.
Timeframe
Quotation timelines are agreed with you to guarantee accurate deliverables.
Deliverables
Itemised quotation, programme outline and planned RAMS issuance date.
Client approval needed
Approval to proceed with the quotation and programme.
Integration Point
Fit-out timelines and manufacturing windows are aligned into a single coordinated schedule.
Furniture is manufactured in-house with QC checkpoints at each stage. For fit-out projects, enabling works and site preparation begins. Installation dates are locked in, aligned to production.
Timeframe
Manufacturing and site preparation scheduled confirmed with the client.
Deliverables
QC sign-offs, install-ready components & updated programme notes.
Client approval needed
Final confirmation of finishes (if required).
Integration Point
Manufacturing progresses in parallel with fit-out preparation, reducing programme length.
Fit-out works and furniture installation proceed as per the agreed programme. Components arrive labelled to room/zone. Installers adjust furniture on-site where conditions differ from drawings.
Timeframe
Varies by site size and access.
Deliverables
Completed installation, daily/weekly progress updates, walkthrough notes.
Client approval needed
Approvals at key installation milestones (if required).
Integration Point
Installation is delivered by RED contract teams, using the same drawings and packs produced for manufacture, allowing immediate adjustments.
We complete a walkthrough, record any snags and close them. Documentation is issued including RAMS, certificates, maintenance information and material data sheets. Practical completion is agreed.
Timeframe
Timeline and plan of action agreed with the client.
Deliverables
Handover pack, snag register and closure record, compliance and maintenance documentation.
Client approval needed
Sign-off on practical completion.
Integration Point
Handover and snag resolution are coordinated by RED with our installation teams.
We provide ongoing support for the installed furniture and fit-out. Spare parts, repairs and modifications are available because all specifications and manufacturing data is retained in-house.
Timeframe
Aftercare provided as required and agreed with the client.
Deliverables
Spares list, maintenance notes, repair or modifications schedule (if required).
Client approval needed
None unless modifications are requested.
Integration Point
Support is straightforward as we manufactured the furniture and hold the build specifications.
One programme. One team. No external suppliers.
RED’s process avoids the common delays found in split fit-out and furniture supply projects.
This keeps scheduled predictable, reduces programme risk and improves installation outcomes – especially in awkward spaces or live-site environments.
Manufacturing, installation and fit-out works are supported by documented QC procedures to guarantee your project is auditable, compliant and ready to fit on delivery with labels, fixing packs, and installation sheets.
Book a site survey to get a buildable programme and installation plan.