Finished on paper, stalled in manufacture? Build feasibility in early to keep your programme on track
A drawing that looks ready to issue can still hide costly problems beneath the surface. Small details like substrate changes, finish transitions, or installation tolerances often slip through until manufacturing starts and then delays hit.